Construction Support

KRBO New AVGAS 100LL and Jet-A Storage and Dispensing Facility

KRBO – Nueces County Airport – New AVGAS 100LL and Jet-A Storage and Dispensing Facility The two-tank system is based on industry-proven fuel systems developed by Argus Consulting. Argus provided design, bidding, and construction support services for a new fuel storage and dispensing system at the Nueces County Airport in Robstown, TX.   The overall…

Read More

Airport Improvement Magazine Feature of LVA Pipeline to Assure Fuel Supply to Harry Reid International (LAS) Airport

Airport Improvement Magazine Feature of LASFuel LVA Pipeline to Assure Fuel Supply to Harry Reid International (LAS) Airport To support the increasing demand for Jet-A fuel at Harry Reid International Airport, the LASFUEL Consortium evaluated various scenarios for future secure fuel delivery. Ultimately, the Airline Consortium elected to negotiate a connection agreement with Kinder Morgan…

Read More

Ribbon Cutting Celebrates the Completion of the Much-Anticipated LASFuel LVA Pipeline at Harry Reid International Airport

Ribbon Cutting Celebrates the Completion of the Much-Anticipated LASFuel LVA Pipeline at Harry Reid International Airport As part of the 2022 annual LASFUEL consortium meeting, key project leaders involved in the planning, funding, design, permitting, and construction of the LVA Pipeline gathered to celebrate the completion of the new strategic infrastructure supplying jet fuel to…

Read More

Rail Locomotive Diesel Shop Oil Piping Replacement and Upgrades

Enhancing user-friendly operations and providing a safer working environment Argus provided design and construction administration for upgrades to the lube oil and used oil piping systems in the diesel shop for enhanced user-friendly operations and a safer working environment. This project replaced most of the lube oil collection and distribution piping in the eight-track maintenance…

Read More

KFBL Fuel Storage and Dispensing System

Designing fuel storage tanks and over-wing dispenser system to make it easy to fuel up and fly Argus was retained for design, bidding phase services and construction support of a new aboveground fuel storage and over-wing self-service dispensing system for Jet A and AVGAS fuel at the Faribault Municipal Airport in Minnesota. The new facility…

Read More

Lake Havasu Marina Fueling System

Design and construction support services to fuel a large marina in the heart of Lake Havasu Lake Havasu is a large reservoir behind Parker Dam on the Colorado River on the border between Arizona and California. The Chemehuevi Indian Tribe has built a new marina at the Havasu Landing Resort and Casino that includes a…

Read More

MCI New Terminal Hydrant Fueling System

Revitalizing Kansas City International Airport through our cross-functional engineering expertise Argus provided terminal hydrant fueling system planning, design, construction administration, and resident engineering services for the aircraft hydrant fueling system (AHFS) and ground support equipment (GSE) fueling associated with a new passenger terminal building to serve the Kansas City International Airport (MCI). All airline operations…

Read More

JFK Bulk Fuel Farm Expansion

From programming and planning, to design and construction administration Argus was retained by JFK Fuel Infrastructure, LLC, an airline consortium, to provide programming, planning, design, permitting, construction administration and resident representative services for the construction of two 80,000 BBL aboveground fuel storage tanks (ASTs) to supplement the capacity of JFK’s Bulk Fuel Storage Farm. This…

Read More
System Analysis

Rental Car Fuel Facilities Tank Replacement at Columbia Metropolitan Airport

Our facility assessment provided options for replacing underground fuel storage with aboveground fuel facilities that are compliant and cost effective. Argus Consulting has been retained for planning, design, bidding and construction administration for a new fuel system at the rental car facilities supporting Columbia Metropolitan Airport. In 2017, Argus conducted an analysis of the existing…

Read More

FLL Terminal Fuel Line Expansion

A new international terminal at Fort Lauderdale-Hollywood International Airport required a new aircraft fueling hydrant system and relocating numerous hydrant pits. Argus Consulting provided fuel system design services and construction oversight of the hydrant fueling system expansion at FLL to serve Southwest Airlines’ new International Terminal. This project included design of the new five gate…

Read More