Construction Management

Davis-Monthan AFB Type III Hydrant System

The new system eliminates a 50+ year old refueling system and eliminates the potential for leaks and cleanup costs and treatment. Argus performed the Design/Bid/Build of a JP-8 Type III hydrant fuel system to support the A-10 Warthog hot refueling efforts at Davis-Monthan AFB. The new hydrant fueling system serves nine aircraft parking positions, each…

Read More

Cannon AFB Pumphouse and Fuel Storage

This project ensures mission success for theater-level and Homeland Defense by reducing response time during crisis operations and aircraft turnaround times for the 130 aircraft operating out of Cannon AFB. Argus Consulting completed the 35% and final design and Title II services for a new Southeast Ramp Satellite Fuels Storage distribution point and a four-truck…

Read More

Eglin AFB Pipeline Project

Argus is part of the Design/Build team for major repairs to the fuel transfer line between the existing Bulk Fuel Facility and the 33rd Fighter Wing Hydrant Fuel Facility at Eglin AFB. Argus performed the 65% and 100% final design and is providing construction support for the installation of an underground, double wall, 8-inch carrier…

Read More