Construction Management
Located on the border with Mexico, demand for fuel had more than tripled at the airport in less than 10 years requiring a $1.36 million fuel system upgrade. South Texas International Airport at Edinburg (KEBG), located north of Edinburg, Texas, replaced the existing underground Avgas 100LL and Jet-A fuel storage tanks and bulk loading capabilities…
Read MoreThe two-tank system is based on industry-proven fuel systems developed by Argus Consulting. Argus provided design and construction services for a 12,000-gallon AVGAS fuel storage tank and 12,000-gallon JET-A fuel storage tank with 30 gpm over-wing self-service combined product dispensing skid at the El Reno Regional Airport in El Reno, Oklahoma. This project is in…
Read MoreArgus met a tight timeline to deliver a new fuel rack and demolish the existing one without impacting completion of the terminal expansion. While most of DFW is serviced by an underground fuel hydrant system, refueler trucks are still needed for aircraft not parked at hydrant-accessible gates. The airport’s only jet refueler truck rack located…
Read MoreProject phasing was complicated by work in the airfield operations area, avoiding the de-icing season, and the need to keep the existing fuel system active throughout construction. The Dallas Fort Worth International Airport is planning to expand the airfield ramp pavement off the southwest corner of existing Terminal D South Ramp to connect with the…
Read MoreCharlotte Douglas will continue growing in the coming decades requiring significant expansion of fuel storage capabilities. The City of Charlotte has retained Argus Consulting for design, construction administration and resident engineering services for an expansion of airport fuel farm. The Fuel Farm development plan includes demolishing existing two 10,000-barrel Tanks and replacing them with one…
Read MoreA challenging project that required construction of new facilities on the existing site while maintaining operations and resolution of prior subsurface environmental issues. Argus Consulting was selected to provide comprehensive planning, design, construction administration and resident engineering services for the new fuel receiving, storage and distribution facility and a 31-gate aircraft hydrant fueling system at…
Read MoreThe Metropolitan Nashville Airport Authority (MNAA) retained Argus Consulting for planning, design, construction, and resident engineering services to upgrade the airport fueling facilities that were constructed in the 1980s. Improvements were made to nearly all fuel system functions including pipeline receipt, truck unloading, fuel storage, hydrant fueling, tank-to-tank transfer and refueling loading. Additionally, the project…
Read MoreThe airport’s existing fuel delivery system is maxed out, so Argus is working with the airlines to secure British Columbia’s role as “Canada’s Pacific Gateway” To ensure a long-term competitive fuel supply for the Vancouver International Airport, a consortium of airlines is building a new delivery system that includes a marine terminal and a fuel…
Read MoreFloat plane Jet-A fueling system at Harbour Air Seaplane Base in Vancouver, Canada Argus Consulting provided design and construction administration support to W.S. Nicholls Western Construction LTD for the installation of a three position Jet-A fueling system for the new Harbour Air Seaplane Base in downtown Vancouver near the Vancouver Convention Centre and Jack Poole…
Read MoreTank car diesel receipt and locomotive fueling facility for Class 1 railway Argus Consulting was retained to design and manage construction for a fuel receipt and fueling facility for a small station designed for maintenance and fueling of railroad snow removal locomotives and equipment in the Sierra Nevada mountains. This project included the controls, electrical…
Read More- « Previous
- 1
- 2
- 3
- 4
- Next »